A ROAD is to be resurfaced this month with work expected to continue for six days.
Driffield Road, Molescroft, between the Molescroft and Driffield Road roundabouts are set to receive the maintenance work from Monday October 15, continuing for six working days.
Temporary traffic lights will be in operation, but to minimise disruption engineers will only work between 9.15am and 3.15pm Monday to Friday, in order to avoid peak times.
Residents living in The Lawns will still have access and pedestrian walkways will be maintained at all times.
For further information contact project engineer, Dave Berry, on 01482 395715.